MIXED SEAL SURFACING
SCOPE:-
This work shall consist of the preparation,
laying and compaction of a close-graded premix surfacing material of 20 mm
thickness composed of graded aggregates premixed with a bituminous binder on a
previously prepared surface, in accordance with the requirements of these
Specifications, to serve as a wearing course.
Close graded premix surfacing shall be of Type A
or Type B.
F Materials:-
·
Binder
·
Coarse aggregates :
Fine aggregates :- The fine aggregates shall consist of crushed rock quarry sands,
natural gravel / sand or a mixture of both. These shall be clean, hard,
durable, un-coated, mineral particles, dry and free from injurious, soft or
flaky particles and organic or deleterious substances.
Aggregate gradation:- The coarse and fine aggregates shall be so graded or combined as to
conform to one or the other gradings shown in Table.
AGGREGATE GRADATION
IS Sieve
Designation
(mm)
|
Cumulative per cent by weight of total
aggregate passing
|
|
Type A
|
Type B
|
|
13.2 mm
|
-
|
100
|
11.2 mm
|
100
|
88 - 100
|
5.6 mm
|
52 - 88
|
31 - 52
|
2.8 mm
|
14 - 38
|
5 - 25
|
0.090 mm
|
0 - 5
|
0 - 5
|
Proportioning of materials:- The total quantity of aggregates used for Type A or B close-graded
premix surfacing shall be 0.27 cubic metre per 10 square metre area. The
quantity of binder used for premixing in terms of straight-run bitumen shall be
22.0 kg and 19.0 kg per 10 square metre area for Type A and Type B surfacing
respectively.
Construction Operations:-
F Opening
to Traffic
Traffic may be allowed after completion of the final rolling when the
mix has cooled down to the
surrounding temperature. Excessive traffic speeds should not be permitted.
F Surface
Finish and Quality Control of Work
For
control on the quality of materials supplied and the works carried out, the
relevant provisions of Section 900 shall apply,
F Measurements
for Payment
Close-graded premix surfacing. Type A or B shall
be measured as finished work, for the area specified to be covered, in square
metres at a specified thickness. The area will be the net area covered, and all
allowances for wastage and cutting of joints shall be deemed to be included in
the rate.
SEAL COAT
F Scope:-
This work shall consist of the application of a
seal coat for sealing the voids in a bituminous surface laid to the specified
levels, grade and cross fall (camber).
Seal coat shall be of either of the two types
specified below:
A)
Liquid seal coat
comprising of an application of a layer of bituminous binder followed by a
cover of stone chips.
B) Premixed seal coat comprising of a thin
application of fine aggregate premixed with bituminous binder.
PRIME COAT
The work shall consist of
application of a single coat of low viscosity liquid bituminous material on Wet
Mix Macadam (WMM) surface before laying bituminous layer on Wet Mix.
Ø MATERIALS:-
Since WMM is considered to be material
of low porosity, it is proposed to use Slow Setting Emulsion for Prime
Coat. The Slow Setting Emulsion shall
comply with IS: 8887 and shall be procured from reputed manufacturer.
Ø PLANT & EQUIPMENT:-
a)
Bitumen pressure distribution
b)
Tractor mounted mechanical broom
c)
Air compressor (when necessary)
d)
Hand sprayer
e)
Water tanker
Ø WEATHER AND SEASONAL LIMITATION:-
Prime coating shall not be applied
to a Wet Surface or during a dust storm or when the weather is foggy, rainy or
windy or when the temperature in the shade is less than 10° C.
Surface to receive emulsion
primer should be damp, but no free or standing water shall be present.
Ø STORAGE OF MATERIALS:-
The material shall be stored at plant
area in Emulsion Storage Tank and shall be transferred to Bitumen/Emulsion
distributor as and when material is required for consumption.
Ø RATE OF SPRAY:-
VISCOSITY
REQUIREMENT AND QUANTITY OF BITUMINOUS PRIMER
Type
of surface
|
Kinematic
Viscosity of Primer at 60°C
(Centistokes)
|
Quantity
per 10 sq. m(kg)
|
Low porosity
|
30 – 60
|
6 to 9
|
Medium porosity
|
70 – 140
|
9 to 12
|
High porosity
|
250 – 500
|
12 to 15
|
Ø CONSTRUCTION OPERATIONS:-
·
ROAD
SURFACE:-
The road surface to be primed shall be
prepared by cleaning surface with mechanical broom and air compressor. Prior to
applying primer, the surface shall be carefully swept clean of dust and loose
particles, care being taken not to disturb the interlocked aggregate. To
achieve this, the WMM surface layer, if required, shall be lightly sprayed with
water and surface allowed to dry to a stage where the surface is slightly moist
at the time of priming.
APPLICATION
OF BITUMINOUS PRIMER:-
The bituminous primer shall be sprayed
uniformly with Bitumen Pressure Sprayer at specified speed. The speed of
Bitumen Sprayer shall be so regulated so as to achieve the required rate of
spray within tolerance limits. The spray
test shall be conducted to check the bitumen spray rate per unit area.
VIEW OF
APPLICATION OF PRIME COAT
Ø SAFETY AND TRAFFIC MANAGEMENT:-
a)
Minimum of 2 flagmen with reflective vests and
holding a red flag each shall be deployed to control the traffic, which may be
affected due to the construction operations.
b)
All locations adjacent to existing road where
construction of pavement works is in progress shall be barricaded and provided
with visible safety and road signs.
c)
No machines or equipment shall be permitted to
remain on the existing road or shoulder unattended at all times unless it is
properly protected and secured in a safe manner.
d)
The Safety Officer shall make frequent patrols
along the highway to ensure that the safety equipment and signs are operational
at all times.
TACK COAT
Tack
coat shall consist of the application of a single coat of low viscosity liquid
bituminous material to an existing bituminous road surface and also over the
prime coat before laying each layer of DBM.
Ø Materials
Quality
This
tack coat used shall be of rapid setting bituminous emulsion and applied at a
rate of between 0.25 to 0.3 kg per sq. meters.
Ø Weather
and Seasonal Limitation
Tack coating shall not be
applied to a Wet Surface or during a dust storm or when the weather is foggy,
rainy or windy or when the temperature in the shade is less than 10° C.
Surface to receive emulsion
should be dry/ slightly damp, but no free or standing water shall be present.
Ø Plants
& Equipments
1) Bitumen pressure
distributor 1 unit
2) Tractor mounted mechanical
broom 1
unit
3) Air compressor (when
necessary) 1 unit
4) Hand sprayer 1 unit
5) Water tanker (Where
necessary) 1 unit
Applying Procedure
·
Before applying the tack coat the surface shall
be swept by tractor mounted mechanical broom/air compressor to clean the dust
and loose particles.
·
Prior to tack coating the material to be used
must be approved by Supervision consultant. The tack coat material shall be
sprayed on to the bituminous using bitumen pressure distributor and at a rate
which is stipulated in the specification as per clause 503.4.3, & Table
500-2. The spray rate is measured using the tray method or sponge method. Hand
spraying of small areas, inaccessible to the distributor, or in a narrow
stripe, shall be sprayed with a pressure hand sprayer.
·
After application of the tack coat same shall be
left to cure until all the volatiles have evaporated (from brown to black)
before any subsequent construction is started. No plant or vehicles shall be
allowed on the tack coat other than those essential for the construction.
USE OF AIR COMPRSSOR BEFORE
TACK COAT
VIEW
OF APPLICATION OF TACK COAT
Such an Informative Blog. This is beneficial and helpful information for the clients who want to get bituminous products should contact the Micro Surfacing Emulsion Trader in India for purchasing the premium quality of products.
ReplyDeletehttps://coatar.in/?utm_source=https%3A%2F%2Fcoatar.in%2F&utm_id=Modi+Kushal
ReplyDelete"MIcro Surfacing Coatar"
“COATAR” - Micro Surfacing Machine is professionally designed & manufactured by Moon Engineering Works Private Limited. We are one of the pioneers in the manufacturing of road construction equipment.
"Micro Surfacing Machine"
ReplyDelete